3.06.2009



Seeing the Floor Joists go up was a delight. Tightened the mud sill to the foundation and nailed into place the rim joists to the mud sill. Immediately we rolled most of the joists on the first floor, plus all double LVL's supports for walls above floor. Marked all required blocking for tomorrow. Monday is inspection.