4.06.2010


Standing Seam Metal Cladding is 100% complete.

Siding is 55% complete.

Concrete Tile Floor is 100% complete. Second floor engineered hardwood floor ( FSC Certified) is arriving at the end of this week. Installation will be over a .25" thick layer of cork. Adhesion will be Zero(0)-VOC & Zero-Solvent adhesive.