3.18.2009





Incredible day, the inspection couldn't have gone better. The building inspector is very satisfied with our performance and the result of the First Floor Subfloor. We have started putting together all vertical framing. 7/20 Columns have placed in their right location. After all Columns are in, then we will proceed to align to  grid and fix them to the metal column bases atop the foundation piers with 2 bolts each. Tomorrow morning we will start bracing columns and framing exterior walls.